Dig 2 - Ranch in Shingle Springs

Stage One
This is the beginning of the dig. We are using a CAT 939 crawler to clear away the grass and to level the site. This step is accomplished as soon as the elevation and location of the pool has been determined. This will be the sub grade.
Stage Two
The layout is an important part of the dig. This will determine the size and the shape of the pool. Once the layout is complete, forms will be built around the pool to insure the shape and elevation.
Stage Three
This is the finished dig. The walls have been carefully trimmed and the floor excavated to the requested depth and slope.

 