Dig 3 - Hillside in Auburn

Stage One
Here we are cutting away the high side and building up the low side to create a level pool site. This is called a cut and fill.
Stage Two
After the pool has been laid out and formed up we continue to build up the low side with the dirt from the pool.
Stage Three
Once the excavation is complete the site is ready for the next phases with plenty of room for decking.

 